I’m very happy to say our S2 11 Meter is going in the water! The total project took just about five months from start to finish. The entire hull has been redone including fixing the rudder. I used Interlux products and West System for the patching and the rudder work. I used bright sides for the top sides and 2000E for the barrier coat followed by VC Offshore for the bottom paint. The results came out great! Very happy to be going in the water!